B1–B8 Cross-Factory Kitting Architecture

Cross-Factory Hardware Kitting Bundles (B1–B8)

Consolidate 4 to 5 specialized manufacturing plants into one Hong Kong Proforma Invoice, one unified pre-shipment QC dossier (VNA S-parameters, 400x fiber end-face, No-RF/Non-DG declarations), and one customs-cleared dispatch under FCA Hong Kong, FOB Hong Kong, or DAP Buyer-IOR.

B1: PCIe Gen5 Kit B2: 400G/800G Pod Kit B3: No-RF Edge Vision Kit B4: Clean Rack Power Kit BOM Configurator

Interactive B1–B8 Cross-Factory Kitting Matrix

Bundle Canonical Kit Name & Scope Target Buyer Profile Indicative FCA/FOB HK Band Lead Time & NRE Mandatory Pre-Shipment QC Artifact Configure / RFQ
B1
Tracks: D2, D8, D3
HS6: 854442
B1: PCIe Gen5 Internal Server Interconnect Kit

MCIO 8i/4i twinax harnesses + SlimSAS/U.3 NVMe fanouts + PCIe 5.0 x16 Retimer riser + 12V-2x6 power whips + VNA S4P eye-diagram report.

GPU/HPC White-Box Server SIs & OCP Integrators
4 factories / 5 BOM lines
$2,480 – $4,200
FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR
7–10 business days
NRE: L2 ($1,500–$2,000) / L3 ($3,000)
TDR_EYE_S4P (PCIe Gen5 32 GT/s 85-Ohm VNA S4P + BER < 1e-12 eye diagram)
ECCN: EAR99
B2
Tracks: D13, D1
HS6: 854470
B2: 400G/800G AI Rack-Scale Pod Interconnect Kit

OSFP/QSFP-DD passive DAC & DSP retimed AEC + cross-coded SR8/DR8/DR4/FR4 optics + MPO-12/16 APC trunks + 400x end-face certification.

Regional Neoclouds, GPU Clusters & Colocation Operators
4 factories / 5 BOM lines
$4,800 – $10,500
FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR
24–48h EEPROM coding / <=10 business days kitted
NRE: L1 ($1,000) / L2 ($1,500)
FIBER_400X + EEPROM_LOG (400x IEC 61300-3-35 end-face & CMIS 5.0 traffic soak)
ECCN: EAR99 / 5A991 (No-MACsec)
B3
Tracks: D6, D7, D9, D3
HS6: 847150
B3: Physical No-RF / Non-DG Industrial Edge Vision Kit

RK3588 NPU fanless box with unpopulated RF pads + supercapacitor NTP RTC (no CR2032 lithium cell) + high-flex PoE+ camera harness + DIN PSU.

Factory Automation & Machine Vision System Integrators
5 factories / 6 BOM lines
$2,650 – $5,400
FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR
8–10 business days
NRE: L2 ($1,500–$2,000)
NO_RF_DECLARATION + NON_DG_DECLARATION (Unpopulated RF pads + Supercap NTP RTC)
ECCN: EAR99 / 5A992
B4
Tracks: D12, D3, D1, D5
HS6: 853710
B4: Colocation Day-1 Clean Rack Power & OOB Management Kit

Dual 3-Phase Zero-U Monitored Smart PDUs + OCP Titanium redundant CRPS PSU + HTML5 OOB IP-KVM + color-coded C13/C19 locking cords.

Colocation Cages, Edge Data Centers & Managed Service Providers
5 factories / 5 BOM lines
$3,200 – $6,800
FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR
7–10 business days
NRE: L1 ($1,000) / L2 ($1,500)
UL_CB + CE_DOC (3-Phase Zero-U Monitored PDU + OCP Titanium CRPS + OOB iKVM)
ECCN: EAR99
B5
Tracks: ROBOT, D7, D9
HS6: 903180
B5: AMR / Mobile Robot 3D Vision & 4S Maintenance Kit

Industrial 3D ToF / Structured-Light RGB-D camera + high-flex drag-chain harness + isolated CAN/RS485 hub + scheduled wear-part spare pack.

AMR Fleet Operators, Warehouse Automation SIs & Robotics 4S Centers
5 factories / 5 BOM lines
$2,900 – $5,800
FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR
8–10 business days
NRE: L2 ($1,500–$2,000)
FDA_ACCESSION + CE_DOC (3D ToF / Structured-Light RGB-D + High-Flex Drag-Chain Kit)
ECCN: EAR99
B6
Tracks: D1, D2, D11
HS6: 851762
B6: ITAD & Third-Party Maintenance (TPM) EOS Rescue Kit

EOS/EOL cross-coded 100G/400G optical transceivers + legacy server backplane harnesses + counter-rotating hot-swap fan & CRPS spares.

Enterprise ITAD Refurbishers & Multi-Vendor TPM Providers
4 factories / 5 BOM lines
$3,500 – $8,500
FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR
5–10 business days
NRE: L1 ($1,000) / L2 ($1,500)
EEPROM_LOG + FIBER_400X (ITAD & TPM EOS Cross-Coded 100G/400G + Fan/Harness Spares)
ECCN: EAR99 / 5A991
B7
Tracks: D13, D2, D12
HS6: 854442
B7: AI Lab & University HPC Cluster Upgrade Micro-Pod

Sub-$10k procurement-ready micro-pod combining 400G/800G DAC/AEC breakouts, MCIO expansion harnesses, smart metered PDU, and full lab QC dossier.

University Supercomputing Labs & Research Institutes
5 factories / 5 BOM lines
$3,800 – $9,200
FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR
7–10 business days
NRE: L1 ($1,000) / L2 ($1,500)
TDR_EYE_S4P + QC_PACK (Sub-$10k Academic & HPC Micro-Pod Procurement Kit)
ECCN: EAR99
B8
Tracks: D1, D13, D2, D12, D11
HS6: 854442
B8: Kwun Tong 3PL SLA Consignment Spare-Pool Pack

Pre-staged critical optics, DAC/AEC copper, MCIO harnesses, and Smart PDUs held in Hong Kong Kwun Tong 3PL for 72h/48h/24h advance replacement.

Multi-Site APAC/MEA Data Center & Industrial Operators
4 factories / 4 BOM lines
$2,480 – $6,500 (+ SLA)
FCA_HK / FOB_HK_SEA / DAP_BUYER_IOR
48h HK 3PL Stock / <=10 business days replenishment
NRE: L1 ($1,000)
QC_PACK (Kwun Tong 3PL Consignment Advance-Replacement Spare Pool)
ECCN: EAR99

Supported Incoterms 2020 & Commercial Governance

All cross-factory kits are transacted on a principal buy-sell basis out of Hong Kong with unmodified factory Certificates of Origin and compliance test reports attached. Delivered Duty Paid terms are never offered; buyers or their licensed brokers act as Importer of Record at destination.

FCA_HK — FCA Hong Kong (Kwun Tong 3PL / Air Cargo Consolidation)

Air / Express Courier: Measured carton dimensions (L*W*H/5000) or 2.0x coil volumetric proxy for uncrated harnesses

FOB_HK_SEA — FOB Hong Kong (Ocean LCL / FCL Container Handover)

Maritime Sea Freight: Measured palletized/crated dimensions with unified export customs clearance

DAP_BUYER_IOR — DAP Destination Facility (Buyer as Importer of Record)

Door-to-Site Freight Pre-arranged; Buyer Clears Import Duties/Taxes: Full commercial invoice, packing list, HS6 mapping, and unmodified factory DoCs attached

Prepaid Engineering NRE & Kwun Tong 3PL Advance-Replacement SLA

NRE L1 ($1,000)

Pinout verification, connector keying check, cross-factory BOM mapping & 2D drawing sign-off

NRE L2 ($1,500-$2,000)

Multi-vendor switch/NIC EEPROM cross-coding, Linux/ROS2 image pre-flash & 48h burn-in log

NRE L3 ($3,000)

PCIe Gen5/800G VNA S-parameter coupon validation, custom overmolding setup, or 2xMOPP safety dossier

SLA_72H_12PCT

72h Kwun Tong 3PL Advance Replacement — 12% of covered spare pool

SLA_48H_15PCT

48h Kwun Tong 3PL Advance Replacement — 15% of covered spare pool

SLA_24H_18PCT

24h Kwun Tong 3PL Advance Replacement — 18% of covered spare pool