B4: Colocation Day-1 Clean Rack Power & OOB Management Kit
Dual 3-Phase Zero-U Monitored Smart PDUs + OCP Titanium redundant CRPS PSU + HTML5 OOB IP-KVM + color-coded C13/C19 locking cords.
Engineering Rationale & Cross-Factory Consolidation Advantage
Deploying new AI or enterprise cages in Southeast Asian, Middle Eastern, or European colocation facilities is frequently stalled by 12-to-20-week lead times from legacy Western rack power brands, mismatched regional input plugs, or accidental inclusion of Class 9 lithium Battery Backup Units (BBUs) that freeze air freight.
Bundle B4 provides a 100% Non-DG (zero lithium battery) Day-1 cabinet infrastructure kit dispatched in 7 to 10 business days: dual A+B feed 3-Phase 32A/63A Zero-U Smart PDUs with per-outlet kWh metering and SNMPv3/Redfish telemetry, an 8/16-port HTML5 Out-of-Band IP-KVM console switch, UL/CB-certified 80 PLUS Titanium CRPS server PSUs, and 24 color-coded (Red/Blue) auto-locking LSZH C13/C19 power cords.
Canonical Bill of Materials (Consolidated 4–5 Factory Kitting)
| Canonical SKU | Kit Qty | Component Specification & Compliance Scope |
|---|---|---|
GO-SKU-15 | 2x | 3-Phase 32A / 63A Zero-U Vertical Monitored & Outlet-Switched Smart Rack PDU (A+B Redundant Feed, Per-Outlet kWh Metering, SNMPv3 / Redfish / HTTPS) |
GO-SKU-16 | 1x | 8-Port / 16-Port Out-of-Band (OOB) HTML5 IP-KVM & Serial Console Switch with Dual AC/DC Power Input for BMC Fallback Management |
GO-SKU-05 | 2x | Pre-Certified 2400W–3200W 80 PLUS Titanium CRPS / OCP Redundant Server Power Supply Module (UL 62368-1 / CB / CE certified) + High-Current Power Whip |
GO-SKU-16 | 24x | Color-Coded Dual-Feed (Red/Blue) IEC C13-to-C14 & C19-to-C20 Auto-Locking Server Power Cords (LSZH jacket, 0.6m / 1.2m / 1.8m mixed lengths) |
GO-SKU-16 | 4x | 100G QSFP28 SR4 / LR4 Management & Uplink Optical Transceivers + 1U Brush Strip, Toolless Blanking Panels & Cable Management Arms (CMA) |
Mandatory Pre-Shipment Verification & Compliance Dossier
UL_CB + CE_DOC
Unmodified factory UL 62368-1, IEC/CB test certificates, and EU LVD/EMC Declarations of Conformity for Smart PDUs and Titanium CRPS modules
EEPROM_LOG
Pre-shipment SNMPv3/Redfish MIB polling log, hi-pot dielectric withstand test certificate, and ground-continuity report
NON_DG_DECLARATION
Clean non-battery rack infrastructure declaration confirming zero UN3480 lithium-ion BBU components for rapid air/sea customs release
Commercial Rules, Freight Volumetric Basis & NRE Options
Incoterms 2020 & Importer of Record
Available under FCA_HK (Hong Kong Air/Courier Consolidation), FOB_HK_SEA (Ocean Freight), and DAP_BUYER_IOR (Delivered to Buyer Facility; Buyer clears import customs). Unmodified factory Certificates of Origin and compliance reports accompany every Proforma Invoice.
Prepaid Engineering NRE Options
L1 ($1,000) Rack Phase-Balance & Cord Length Schedule | L2 ($1,500) Pre-Staged SNMPv3/Redfish PDU & OOB IP-KVM Addressing. Minimum order value USD $5,000 (or USD $2,000–$4,999 trial lot with +$300 kitting handling fee); 7-day quote lock.
Volumetric Freight & Kwun Tong 3PL SLA
Zero Class-9 lithium BBU hazmat items included; measured wooden-crate or palletized dimensions used for accurate air/sea freight calculation. Optional Kwun Tong 3PL advance-replacement spare pool SLA: 72h (+12%/yr), 48h (+15%/yr), or 24h (+18%/yr).
Technical & Procurement FAQ
Does Bundle B4 contain any lithium-ion BBU or UPS batteries that trigger hazardous-cargo holds?
No. Bundle B4 is strictly a clean AC/DC rack power distribution and Out-of-Band management kit (Track D12/D3) with zero UN3480 or UN3091 battery cells. It ships as standard non-hazardous commercial cargo via air or ocean under FCA Hong Kong, FOB Hong Kong, or DAP Buyer-IOR.
Which management protocols and security standards do the Zero-U Smart PDUs support?
The included 3-Phase Metered and Outlet-Switched Smart PDUs support SNMPv3, RESTful Redfish API, HTTPS/TLS, Modbus TCP, and daisy-chained environmental sensor ports with +/-1% billing-grade kWh accuracy.
How does the color-coded auto-locking cord pack prevent accidental server power drops?
Each kit includes 12 Red (Feed A) and 12 Blue (Feed B) Low-Smoke Zero-Halogen (LSZH) IEC C13-to-C14 and C19-to-C20 cords in graduated lengths (0.6m, 1.2m, 1.8m) with mechanical retention latches rated against vibration and cable-tension pullout.
Are original factory safety certificates provided for colocation facility inspection?
Yes. Every B4 shipment attaches unmodified factory UL 62368-1, IEC CB Scheme, and CE LVD/EMC Declarations of Conformity alongside factory serial numbers and hi-pot dielectric test logs required by colocation facility engineers.