How solar PV TCO is modelled
For a PV plant the dominant variables are specific yield, degradation, and how much of the balance of system has to travel with the modules.
Cost lines in a PV model
| Line | What it covers |
|---|---|
| Modules | Panel class and quantity, with the FOB price as the starting point. |
| Balance of system | Mounting, cabling, combiner and protection, inverters, and monitoring. |
| Delivery and install | Freight, duty, VAT, haulage, installation and grid connection. |
| Operation | Cleaning, inspection, inverter replacement and insurance over the analysis horizon. |
| Yield | Specific yield for the stated location and mounting type, with degradation applied year by year. |
What stays open until confirmed
Specific yield is a modelled assumption unless a site measurement or a bankable study exists. Soiling, shading and grid curtailment are often unquantified in a first pass, and they can change the answer more than a small change in module price.
In addition, shipment-specific IEC 61215-1:2021 and IEC 61730-1/-2 module certificates, IEC 62109-1:2010 and IEC 62109-2:2011 inverter safety approvals, mounting-rail structural calculations, net-metering or gross-metering export tariffs, and destination customs duties on crystalline silicon modules (HS 8541.43.00) and string inverters (HS 8504.40) remain open until confirmed against OEM datasheets, utility interconnection rules, and national tariff schedules.
Worked example
The 2 MWp rooftop study shows the cost stack and cash flows for a stated case, with assumptions marked as assumptions. Its numbers belong to that case and its evidence date.
That Indian convention center scenario models a 2,000 kWp DC rooftop array (~13,000 m² roof area at ~6.5 m²/kWp) referencing LONGi Hi-MO 7 LR7-72HGD bifacial modules, Sungrow SG125HV 125 kW three-phase string inverters, and K2 Systems CrossRail mounting over a 25-year horizon at a 10.00% real discount rate. At the bounded defaults—42,000 INR/kWp turnkey CapEx (INR 840,000,000 at Year 0), 1,430 kWh/kWp/year Year-1 specific yield (0.82 design performance ratio), 0.5%/year module degradation, 1.0% of CapEx annual O&M plus 0.4% insurance, a 10% of CapEx inverter replacement reserve in Year 12 (INR 84,000,000), and 100% self-consumption against an INR 8.50/kWh grid tariff escalating at 1.5%/year real with zero export credit—the model returns an LCOE of INR 39.63/kWh, an IRR of -0.0794, and a negative NPV of INR -753,505,224.37 with no payback in 25 years, illustrating how a high CapEx-to-tariff ratio prevents capital recovery.
What this model does not tell you
It does not tell you the yield your roof will produce, the tariff you will be paid, or whether your interconnection will be granted. It shows which of those you still have to establish.
In the computation engine, annual generation in Year y is calculated as kwp * specific_yield_kwh_per_kwp * (1 - degradation_pct_per_year)^(y - 1), split between self-consumed kWh valued at tariff_per_kwh and exported kWh valued at export_tariff_per_kwh (both escalating at tariff_escalation_pct), while LCOE divides the present value of discounted lifecycle costs by the present value of discounted generation.
How this differs from the other classes
Solar is the class where the cost of the equipment is least predictive of the outcome. Two identical module orders in two locations produce different results, because the yield assumption dominates the calculation.
Because solar PV has no fuel or charging-electricity input cost during operation, its default sensitivity profile in the engine turns on three external site and finance parameters—discount rate, self-consumption tariff per kWh, and specific yield (kWh/kWp/year)—plus the mid-life inverter replacement reserve.
Questions to put to a supplier
- What power tolerance and degradation curve does the module warranty state?
- What specific yield is the model using, from which source, and is it P50 or P90?
- Which balance-of-system items are inside the quoted price and which are excluded?
- At what year is inverter replacement assumed, and at what cost?
- What soiling, shading and curtailment assumptions are applied?
The input most often left unverified
Specific yield. It is usually carried over from a regional average rather than measured at the site, and a modest error in yield moves the whole business case. A site-specific study is the only way to replace the assumption with evidence.
Frequently asked questions
What five cost and performance lines drive a commercial solar PV TCO model?
A solar PV TCO model tracks five core lines: modules (panel class and quantity, starting from the FOB price); balance of system (mounting, cabling, combiner and protection, inverters, and monitoring); delivery and install (freight, duty, VAT, haulage, installation, and grid connection); operation (cleaning, inspection, inverter replacement, and insurance over the analysis horizon); and yield (specific yield for the stated location and mounting type, with degradation applied year by year).
Why is site-specific solar yield more decisive for LCOE than module ex-works price?
Solar PV is the equipment class where hardware cost is least predictive of the outcome: two identical module orders installed in two locations produce different results because the yield assumption dominates the calculation. Specific yield is usually carried over from a regional average rather than measured at the site, and a modest error in yield moves the whole business case more than a small change in module price.
How does the split between on-site self-consumption and grid export affect solar payback?
A scenario PV model does not tell a buyer the actual yield the roof will produce, the tariff that will be paid, or whether grid interconnection will be granted, showing instead which inputs still must be established. In addition, soiling, shading, and grid curtailment are often unquantified in a first-pass model, and those open site variables can change the financial outcome more than a small difference in module price.
Why do 25-year solar PV TCO models include a mid-life cost spike around Year 12 or Year 13?
In a solar PV TCO model, the operation line covers cleaning, inspection, insurance, and inverter replacement over the analysis horizon alongside balance-of-system inverters, mounting, cabling, combiner, protection, and monitoring hardware. Because inverter replacement enters the operating cost stack during the analysis horizon, buyers should ask the supplier at what year inverter replacement is assumed in the model and what replacement cost is applied.
What five questions should a commercial solar buyer ask an EPC or supplier before contracting?
Buyers should ask a solar supplier five questions: (1) what power tolerance and degradation curve the module warranty states; (2) what specific yield the model uses, from which source, and whether it is P50 or P90; (3) which balance-of-system items are inside the quoted price and which are excluded; (4) at what year inverter replacement is assumed and at what cost; and (5) what soiling, shading, and curtailment assumptions are applied.