How we model landed cost and total cost of ownership

Tradvolt’s cost guides use scenarios to show how import and ownership costs can affect a buying decision. Results depend on the stated inputs and are not quotes.

Method

1. Define the case: identify the reference equipment, destination, use, analysis horizon and discount rate.

Every scenario begins by fixing the currency, evidence base date, operating horizon (10 to 25 years across our storage, EVSE, and solar studies), and annual discount rate (such as 8.00% in the Ghana ground-mount solar, Italy resort hybrid, and MEA hospital storage cases). It names the publicly marketed reference hardware—such as Jinko Tiger Neo N-type 670 W modules, a Sungrow SH20T 20 kW hybrid inverter with CATL LFP battery modules, or a 3 MWh CATL EnerC cabinet with a Sungrow ST3440KTL-HV PCS—so datasheet limits and certification scopes can be checked at the RFQ stage.

2. Separate sourced inputs from assumptions: label scenario defaults and pending lookups; record the source and date for cited claims.

Each input table distinguishes public references (OEM landing pages, IEC and UL standards, UN 38.3 transport rules, IRENA round-trip efficiency and O&M benchmarks, and BloombergNEF pack-price survey medians) from explicit bounded model defaults (specific yield, cycling profile, tariff escalation, self-consumption share, and residual value). Where customs duties or VAT depend on national tariff rulings, the table marks those cells as pending lookups against portals such as the Ghana Revenue Authority, EU TARIC, or Agenzia delle Entrate rather than stating a fixed rate.

3. Build the cost stack: list equipment and relevant import, installation and operating costs. Check which lines actually enter the calculation.

The model organises outlays into Year-0 capital costs (equipment, ocean freight, marine insurance, border charges, balance of system, and installation), recurring annual operating expenses starting in Year 1 with compounded escalation, scheduled mid-life replacements or battery augmentation reserves, and end-of-horizon residual credits. Readers should verify whether an operating-cost table is netted inside the cash-flow run or shown as a separate checklist.

4. Calculate and interpret: read the year-by-year cost, benefit and energy cash flows alongside discounted and undiscounted totals, and metrics such as NPV, payback or LCOE/LCOS where provided.

For each year from Year 0 to the end of the horizon, the engine computes annual cost, annual benefit, net cash flow, discount factor 1 / (1 + discount_rate)^year, discounted net cash flow, and degraded kWh delivered. From that single table it derives undiscounted and present-value totals, Net Present Value (NPV), bisection Internal Rate of Return (IRR), cumulative-sum simple and discounted payback, and Levelised Cost of Electricity or Storage (PV of costs / PV of delivered energy).

5. Identify gaps before procurement: obtain current supplier and service quotes, confirm the applicable tariff and tax treatment, and check equipment documents and local requirements.

Before issuing a purchase order, buyers replace bounded scenario defaults with binding supplier FOB or CIF quotes, forwarder freight rates, licensed customs-broker rulings on HS headings (such as HS 8541.43.00 for PV modules, HS 8504.40 for inverters, and HS 8507.60 for lithium-ion accumulators), DSO grid-connection approvals, and shipment-specific OEM manual revisions and test certificates.

Cost lines in the studies

Cost lineHow it appears
Equipment and balance of systemFOB equipment and components, or a turnkey capital cost.
Freight and insuranceOcean freight and marine insurance where applicable.
Border and deliveryDuty, levies, VAT, brokerage, port charges and inland haulage; rates can be pending.
Installation and commissioningInstallation, commissioning and grid-connection paperwork.
Operation and lifecycleMaintenance, monitoring, spares, insurance, replacement or battery augmentation; charging cost in a storage model.

A checklist is not necessarily a cash-flow input. The Ghana study lists operating costs separately and says they are not netted in its scenario TCO. The Italy and hospital studies include recurring costs in their cash flows.

What we verify / what we do not assert

The studies point buyers to OEM documents, applicable standards and official customs or tax portals, and flag items for confirmation at RFQ or import. A reference to a standard does not establish that a specific product or lot is certified. HS classification, duty and VAT depend on the goods and destination and may remain pending; confirm them with the relevant authority and a qualified local broker.

Model assumptions, indicative prices and calculated outcomes are not verified project facts, binding quotations or guaranteed savings. Exclusions matter: the hospital case does not monetize resilience, demand charges or carbon credits. The figures and sources belong to their stated evidence dates and should be checked again before use.

Sourcing note

The examples below cite OEM material, IEC publications, the Ghana Revenue Authority, EU TARIC and Italian tax authorities, as well as IRENA and other named sources. Follow each study’s source rows for the specific claim and date; a citation to a publication does not verify every scenario input.

Frequently asked questions

How does Tradvolt separate sourced facts from scenario assumptions in a cost study?

Each study first defines the case by identifying the reference equipment, destination, use case, analysis horizon, and discount rate. It then separates sourced inputs from model assumptions by labelling scenario defaults and pending lookups while recording the specific source and evidence date for every cited claim from OEM material, IEC publications, customs or tax portals, and named research sources.

What five cost stages make up a Tradvolt landed-cost and TCO stack?

The cost stack in Tradvolt studies covers five lines: equipment and balance of system (FOB equipment and components or turnkey capital cost); freight and insurance (ocean freight and marine insurance where applicable); border and delivery (duty, levies, VAT, brokerage, port charges, and inland haulage); installation, commissioning, and grid-connection paperwork; and operation and lifecycle costs including maintenance, monitoring, spares, insurance, replacement or battery augmentation, and storage charging cost.

Why do some studies stop at landed cost while others extend to full multi-year TCO?

In a Tradvolt study, a cost checklist is not automatically a cash-flow input, so readers must check which lines actually enter the calculation. For example, the Ghana solar import study lists operating costs separately and states that they are not netted in its scenario TCO, whereas the Italy hybrid system and hospital battery storage studies include recurring operating costs in their year-by-year cash flows alongside discounted totals, NPV, payback, or LCOE and LCOS.

Why are import duty rates and VAT marked as pending in Tradvolt cost studies?

HS classification, import duty, levies, and VAT depend on the exact goods and destination country, so border and delivery rates can remain pending in a scenario study. Rather than asserting unresolved tax treatment as a fixed project fact, the studies point buyers to official customs or tax portals and flag tariff classification, duty, and VAT for confirmation before procurement with the relevant customs authority and a qualified local broker.

Which financial co-benefits are excluded from baseline cash-flow calculations?

Model assumptions, indicative prices, and calculated scenario outcomes are not binding quotations or guaranteed savings, and study exclusions directly affect cash flows. Specifically, the hospital battery storage case does not monetize outage resilience, demand charges, or carbon credits in its baseline calculation. Before procurement, buyers must obtain current supplier and service quotes, confirm applicable tariff and tax treatment, and recheck all figures against their stated evidence dates.