Bundle B7: University & Research Lab HPC Micro-Pod Kit
Turnkey multi-node 200G/400G low-latency switch-to-server DAC/optics interconnect, PCIe Gen5 MCIO storage/GPU expansion, and monitored rack PDU kit engineered for university AI labs and HPC research clusters under single-PI <$10,000 USD direct procurement thresholds.
Engineering Architecture & Commercial Scope
University AI groups, bioinformatics clusters, and national research laboratories frequently acquire 4-to-8 node GPU/HPC micro-pods only to face multi-week commissioning stalls caused by incompatible switch-to-NIC breakout cables, missing PCIe Gen5 MCIO harnesses, and protracted public tender procedures when orders exceed institutional micro-purchase limits.
Canonical Bundle B7 packages the entire L1 physical layer into one pre-validated kit priced at $8,800 USD FOB Hong Kong (within the $3,800–$9,200 USD commercial band), enabling principal investigators and lab managers to execute direct P-Card or <$10,000 USD micro-procurement without multi-month formal bidding. Every breakout DAC/AEC is asymmetrically coded for your exact switch and NIC firmware matrix.
Sub-Component Bill of Materials (BOM) & Compliance Matrix
| Canonical SKU / Track | Sub-Assembly & Technical Specification | HS6 / Export Class | Qty / Kit | Verification Artifact |
|---|---|---|---|---|
GO-SKU-09 · D13 | 400G QSFP-DD to 2x200G QSFP56 / 4x100G QSFP28 Low-Latency Breakout DAC / AEC Cables (Asymmetric dual-vendor EEPROM coding for Arista/SONiC leaf switch to NVIDIA/Mellanox ConnectX NICs, VNA S-parameter report, 2027–2028 448G/CPO rotation clause). | HS 854442 · EAR99 | 8 cables | TDR_EYE_S4P · EEPROM_LOG |
GO-SKU-07 · D13 | 400G QSFP-DD Passive Direct Attach Copper (DAC) Spine-to-Leaf Trunk Cables (8x50G PAM4, 26–30 AWG, 1.0m–2.5m rack-elevation matched lengths, pre-coded dual-end EEPROM with insertion-loss/return-loss verification). | HS 854442 · EAR99 | 4 cables | TDR_EYE_S4P · EEPROM_LOG |
GO-SKU-14 + 11 · D1 | 400G QSFP-DD DR4 (500m) Campus Uplinks + MPO-12 APC Elite Low-Loss OM4/OS2 Fiber Trunks (Insertion loss <= 0.35 dB, No-MACsec EAR99/5A991 compliant, 400x interferometry end-face report for campus core connectivity). | HS 851762 · 5A991/EAR99 | 4 optics + 4 MPO | FIBER_400X · EEPROM_LOG |
GO-SKU-13 · D2 | PCIe Gen5 x16 Retimer Expansion Card (4x MCIO 8i) + 6x MCIO 8i / U.3 / E3.S Internal Node Harness Kit (Astera Aries / Broadcom class retimer compensating 36 dB channel loss, joint eye-diagram & BER < 1e-12 validation report). | HS 847330 · EAR99 | 2 node kits | TDR_EYE_S4P · QC_PACK |
GO-SKU-15 · D12 | Monitored & Outlet-Switched Zero-U 32A Smart Rack PDU (SNMP v3 / Redfish REST API telemetry for per-node GPU energy profiling, IEC C13/C19 locking sockets, UL/CE certified with color-coded power whips). | HS 853710 · EAR99 | 2 units | UL_CB · CE_DOC |
Unified Hong Kong Quality Control & Trade Compliance Protocol
L1 Switch-to-NIC Compatibility Matrix Pre-Flash: Asymmetric dual-end EEPROM programming (e.g., 400G Arista/SONiC switch port to 2x200G or 4x100G NVIDIA ConnectX NICs) verified against tv_compat_tested.
VNA S-Parameter & BER < 1e-12 Eye Diagram Validation: Full insertion-loss, return-loss, and retimer eye-opening test reports packed per serial number.
Rack Elevation Cable Length Audit: Pre-sorted 0.5m to 2.5m trunk and breakout lengths labeled by rack U-position to prevent cabinet door interference and airflow blockage.
Academic Compliance & ECCN Dossier: Complete EAR99 / 5A991 classification declarations, UL/CE PDU safety certificates, and single English Hong Kong Proforma Invoice.
Kwun Tong Bonded 3PL Advance-Replacement SLA Tiers
| SLA Dispatch Tier | Carrier Handoff Window | Annual Pool Retainer | Operational Mechanics & Title Lock |
|---|---|---|---|
SLA-72H | Within 72 Hours (HK Cutoff) | +12% / year on covered spare value | Pre-coded spares staged in Kwun Tong 3PL; flash-title drawdown upon cleared funds and dispatch authorization. |
SLA-48H | Within 48 Hours (HK Cutoff) | +15% / year on covered spare value | Priority bonded pull with pre-attached 400x optical / TDR reports and tamper-evident QC seal. |
SLA-24H | Within 24 Hours (HK Cutoff) | +18% / year on covered spare value | Same-day air courier handoff (FCA Hong Kong / DAP Buyer-IOR) for mission-critical colocation and fleet recovery. |
Commercial Terms, Volumetric Freight & Neutral Kitting Rules
- Single English Proforma Invoice (PI): Consolidates 4 to 5 specialized manufacturing plants into one shipment and one unified quality dossier.
- Incoterms 2020 Discipline: Available under FCA Hong Kong (air courier/freight), FOB Hong Kong (ocean), CPT, CIP, or DAP Buyer-IOR.
- Volumetric Air-Freight Rule: Coiled high-speed DAC/AEC/MPO cables and foam-protected harnesses are calculated at 2.0x actual gross weight for air chargeable weight.
- Neutral Kitting & Traceability: Preserves original Country of Origin markings, factory serial numbers, and CE/UL/FCC declarations beneath the Tradvolt master QC cover sheet.
Frequently Asked Technical & Procurement Questions
Why is the standard Bundle B7 configuration structured at $8,800 USD FOB Hong Kong?
Many US and European university research laboratories (such as ERSO / P-Card micro-purchase programs) can approve hardware interconnect purchases below $10,000 USD directly through the lab director without a 3-to-6 month public tender cycle.
How does asymmetric EEPROM coding work on the 400G-to-2x200G/4x100G breakout cables?
The 400G QSFP-DD trunk end is flashed with your top-of-rack switch vendor profile (e.g., Arista, Cisco, Juniper, or Edgecore SONiC), while the 200G/100G breakout tails are independently coded for your server NICs (e.g., NVIDIA/Mellanox or Intel), preventing link flapping.
Does Bundle B7 include GPU servers or only the non-controlled L1 interconnect and power infrastructure?
Bundle B7 strictly supplies EAR99 / 5A991 physical-layer interconnect, PCIe Gen5 retimer/MCIO kits, and smart rack PDUs. We never trade export-restricted complete GPU servers (Track D4), allowing clean, rapid customs clearance worldwide.